Jump to content
Aero Precision - Premier C130 Aftermarket Support
Aero Precision - Premier C130 Aftermarket Support
Aero Precision - Premier C130 Aftermarket Support
 

Lockheed Service News

Sign in to follow this  

53 files

  1. Lockheed Service News No. 22 May-Jun 1960

    Contents
    Heli-coil Inserts.....3 GTC Fuel Clusters can be Interchanged, providing.....6 Urinal Corrosion Control.....10

    271 downloads

    0 comments

    Submitted

  2. Lockheed Service News No. 23 May-Jun 1960

    Contents
    Air Conditioning.....3 Cargo Compartment System Description.....3 Automatic Operation, Warm Selection.....7 Automatic Operation, Cool Selection.....8 Manual Control.....9 The Floor Heat System.....9 Troubleshooting.....11

    261 downloads

    0 comments

    Updated

  3. Lockheed Service News No. 24 Sep-Oct 1960

    Contents
    Circuit Breaker Decals.....2 Troops Behind the Troops.....3 Index, Issues 1-23.....7 Flap Drive Couplings.....11 Main Gear Check Valves.....12 Replacing the ATM.....13 Aux. Hydraulic Placard Change.....14

    245 downloads

    0 comments

    Submitted

  4. Lockheed Service News No. 25 Nov-Dec 1960

    Contents
    C-130A.....3 GC-130A.....6 RC-130A......6 C-130D.....7 Comparison Chart.....8 C-130B.....9 GV-1......10 BLC.....11 C-130BL.....12 C-130E.....13 SC-130B.....14

    331 downloads

    0 comments

    Updated

  5. Lockheed Service News No. 33 Mar-Apr 1962

    Contents
    Meet the C-130E...3 Fact Sheet.....6 Overall Dimensions.....7 Station Diagram.....8 Airframe.....10 Power Plant, Propellers and GTC The 401st C-130

    301 downloads

    0 comments

    Updated

  6. Lockheed Service News No. 34 May-Jun 1962

    Contents
    Hydraulic Systems.....3 Landing Gear.....8 Electrical System.....10 Fuel System.....12

    854 downloads

    0 comments

    Submitted

  7. Lockheed Service News No. 35 Jul-Aug 1962

    Contents
    Environmental Systems.....3 Air conditioning and Pressurization.....4 Oxygen System.....7 Oxygen Safety.....12

    511 downloads

    0 comments

    Submitted

  8. Lockheed Service News No. 36 Sep-Oct 1962

    Contents
    Flight Directing...4 MA-1 Flight Director System.....5 Course Indicator.....5 Approach Horizon Indicator.....6 Air Force Standard Flight Director System.....7 Horizontal Situation Indicator.....7 Attitude Director Indicator.....8 SC-130B and GV-1 Systems.....11 Interim Procedure (C-130E).....14

    313 downloads

    0 comments

    Submitted

  9. Lockheed Service News No. 37 Nov-Dec 1962

    Contents
    Weighing the C-130.....3 Weight and Balance Publications.....8 STOL.....14  

    811 downloads

    0 comments

    Updated

  10. Lockheed Service News No. 38 Jan-Feb 1963

    Contents
    Circuit Breakers......3 Auxiliary Ventilation Valve.....8 Brake Hoses.....9 Magnetic Compass Error.....9 Repair of the Epoxy-Bonded Radome.....10 Tire Change Counters.....12 Gear Box Grease Leaks.....13 Weighing Frequency Requirements.....14

    264 downloads

    0 comments

    Submitted

  11. Lockheed Service News No. 40 May-Jun 1963

    Contents
    Inflight Refueling System.....3 The System in General.....4 Guillotines and Guillotine Cartridges.....9 Foam Core Rdome Repair.....11 Epoxy Anti-Static Radome Coating.....13

    697 downloads

    0 comments

    Submitted

  12. Lockheed Service News No. 41 Jul-Aug 1963

    Contents
    All Weather Operations  Part I: Extreme Cold.....3 Wind Effect.....10 Landing Light Adjustment.....11 Available Brakes.....13

    413 downloads

    0 comments

    Updated

  13. Lockheed Service News No. 42 Sep-Oct 1963

    Contents
    Fuel Contamination.....3 Contamination Characteristics.....4 Countermeasures.....6 Harmful Effects of Contamination.....8 Fuel Sampling.....8 Improvement Program.....9 Cleaning Fuel Tanks and Probes.....9 Fuel Tank Corrosion (Reprinted from Service News issue #29).....12

    244 downloads

    0 comments

    Submitted

  14. Lockheed Service News No. 43 Nov-Dec 1963

    Contents
    Rivets.....3 Solid Rivets.....3 Ice Box Type Alloys.....4 Rivet Alloy Chart.....4 Specialized Rivets.....4 Rivet Identification Chart.....8 Part Numbers.....10 Propeller Pitch Locked Operation.....11 Grip Scales.....14

    499 downloads

    0 comments

    Submitted

  15. Lockheed Service News No. 44 Spring Quarter 1964

    Contents
    Servicing.....3 C-130A, RC-130A,C-130D....8 C-130B, HC-130B.....10 C-130F,KC-130F,LC-130F.....12 C-130E,C-130G,HC-130H.....14 Tire Inflation (All Models).....16 Brightening.....17

    377 downloads

    0 comments

    Submitted

  16. Lockheed Service News No. 45 Summer Quarter 1964

    Contents
    Flareless Fittings.....3 Hydraulic Contamination.....8 Paneloc Fasteners.....13 Keep it on the Road.....14 463L Loading Demonstration....18  
     

    536 downloads

    0 comments

    Submitted

  17. Lockheed Service News No. 46

    Contents
    Cargo C-130E.....3 Fact sheet.....6 Overall Dimensions.....7 Station diagram.....8 Airframe.....10 Power Plant, Propellers and GTC.....12 Air Conditioning and Pressurization.....14 Oxygen System.....17 Fuel System.....22 Hydraulic System.....25 Landing Gear.....30 Power Distribution.....33

    378 downloads

    0 comments

    Submitted

  18. Lockheed Service News No.1 Nov-Dec 1956

    Contents
    A NEW MWMBER JOINS THE AIRFORCE TEAM.....2 MEET THE HERCULES.....3 GROUND HANDLING.....9 GROUND LOCKS....9 PROTECTIVE COVERS AND PLUGS.....11 TOWING.....12 MOORING.....16

    1,190 downloads

    0 comments

    Updated

  19. Lockheed Service News No.10 May-Jun 1958

    Contents
    OPERATION OF THE C-130A PRESSURUZATION SYSTEM.....3 RADIOACTIVE ESCAPE HATCH MARKERS.....12 GTC OIL.....13 ENGINE DRIP ANS KEEP HANGAR FLOORS CLEAN.....14

    711 downloads

    0 comments

    Updated

  20. Lockheed Service News No.11 Jul-Aug 1958

    Contents
    THE CARGO FLOOR.....3 AIR TURBINE MOTOR CONFIGURATIONS.....8 STRATOS ATM OIL LEAKS.....10 NEW ALL-PURPOSE LADDER.....11 WIPING JACK SCREWS.....12 INDEX.....13

    964 downloads

    0 comments

    Updated

  21. Lockheed Service News No.12 Sep-Oct 1958

    Contents
    MA-1 FLIGHT DIRECTOR SYSTEM.....3 DOOR SEALS.....9 A CASE OF MISTAKEN IDENTITY (CONNECTING THE ENGINE STARTER HARNESS TO THE TACH GENERATOR).....11 REMOVAL OF LINE FILTERS FROM THE WING ANTI-ICING SYSTEM.....12 CHECKING CARTRIDGE CONTINUITY - FIRE EXTINGUISHER BOTTLES.....13

    872 downloads

    0 comments

    Updated

  22. Lockheed Service News No.13 Nov-Dec 1958

    Contents
    MORE ON MA-1.....2 NESA WINDOW MAINTENANCE.....3 A-C GENERATORS VS ENGINE SPEEDS.....12

    1,662 downloads

    0 comments

    Updated

  23. Lockheed Service News No.14 Jan-Feb 1959

    Contents
    The C-130B Airplane
    EXTERIOR AND INTERIOR.....3 ELECTRICAL SYSTEMS.....4 HYDRAULIC SYSTEMS.....6 AIR CONDITIONONG AND PRESSURIZATION SYSTEMS.....11 ENGINES, PROPELLERS AND GTC.....14 FUEL SYSTEM.....16 MISCHELANEOUS SYSTEMS.....18  

    1,057 downloads

    0 comments

    Updated

  24. Lockheed Service News No.15 Mar-Apr 1959

    Contents
    A-C GENERATOR WINDOW COVERS.....2 LOCK-CLAD CABLES.....3 C-130 ELECTRICAL CONNECTORS.....5 THE -4 ILLUSTRATED PARTS BREAKDOWN.....7 STATIC LINE ANCHOR CABLES.....11 LOW ENGINE OIL PRESSURE.....13 RAMP BUMPER BOARDS.....14

    1,484 downloads

    0 comments

    Updated

  25. Lockheed Service News No.16 May-Jun 1959

    Contents
    Forward Cargo Door Can Be Dangerous......2 C-130A Modernization Program.....3 "O" Ring Seal Identification.....7

    473 downloads

    0 comments

    Submitted

Sign in to follow this  
Champion Aerospace




×