Jump to content

54H60 Blade Inspection


quietleader
 Share

Recommended Posts

If it takes approximately four hours to inspect a 54H60 propeller blade using conventional (manual) methods, and an automated inspection system reduces inspection time to only 30 minutes or less, why don't propeller MRO shops take advantage of those man-hour savings?

Here is an example of automatic 54H60 (laser) inspection: https://vimeo.com/185271141

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...