T56MX 10 Posted January 29 Share Posted January 29 Anybody know who might have the fastest engine change on the flt line in Gander Newfound? Quote Link to post Share on other sites
T56MX 10 Posted January 29 Author Share Posted January 29 Let me rephrase the question. Has anyone done an engine change on the flt line during January in Gander Newfound and how long did it take? Quote Link to post Share on other sites
pjvr99 35 Posted January 30 Share Posted January 30 Dont know about Gander ...... The SAAF back in the 80's did one in about 4hrs including the engine run. Quote Link to post Share on other sites
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.