Hey guys,
I have been trying to rig the cargo ramp, and I've run into some issues; I have completed the internal rig and external rig on the ramp. Locks 10 are both raised one shim to keep the load on them, but unfortunately locks l/h 2 and r/h 4 are engaged (raising the ramp by 1/4 -1/2 ") even though they have no vertical shims installed. I realize that simply adding a couple more shims to locks 10 would probably solve the issue,. BUT the ramp has now started to raise the door up.
Can't seem to add any more to 10, and can't take any away.
Maybe I'm missing something simple.