Jump to content

New Guy

Members
  • Posts

    11
  • Joined

  • Last visited

Everything posted by New Guy

  1. May be, will attach the pics also
  2. Thanx for the reply, I am aware of it, I was just curious why only 30 sec, why not 1 min or any other timing. Rhanx
  3. These are 10000 lbs teidown rings
  4. Hi everyone, Can you please tell me why there are two sides facing tiedown rings (near troop door) . What is the benifit Or the concept behind this (placing only these two in this orientation). thank you Regards
  5. Hey, Can someone please tell why there is 30 sec time out during priming and cross feed operation. like what is the relevance of 30 sec timeout. Regarda
  6. Hi All, What exactly does the HRD modification is, for operation of C-130j ramp and door atbor bove 15000 ft.
  7. Can somebody please tell me why the LS of C-130J-30 starts 130 inches ahead of the nose. Regards
  8. Hi Everyone, I am new to this fleet, I was going through section 6 of loading manual, and it says axle weight more than 13000 lbs can be carried using shoring. Can you please help me out as in how to calculate the shoring dimensions for airlifting such cargo.
×
×
  • Create New...