New Guy
-
Posts
11 -
Joined
-
Last visited
Content Type
Profiles
Forums
Store
Gallery
Downloads
Calendar
C-130 Hercules News
Posts posted by New Guy
-
-
Thank you
-
Thanx for the reply,
I am aware of it, I was just curious why only 30 sec, why not 1 min or any other timing.
Rhanx
-
These are 10000 lbs teidown rings
-
Hi everyone,
Can you please tell me why there are two sides facing tiedown rings (near troop door) . What is the benifit Or the concept behind this (placing only these two in this orientation).
thank you
Regards
-
Hey,
Can someone please tell why there is 30 sec time out during priming and cross feed operation. like what is the relevance of 30 sec timeout.
Regarda
-
Thanx for the repy
-
Thanx for the answer
-
Hi All,
What exactly does the HRD modification is, for operation of C-130j ramp and door atbor bove 15000 ft.
-
Can somebody please tell me why the LS of C-130J-30 starts 130 inches ahead of the nose.
Regards
-
Hi Everyone, I am new to this fleet, I was going through section 6 of loading manual, and it says axle weight more than 13000 lbs can be carried using shoring. Can you please help me out as in how to calculate the shoring dimensions for airlifting such cargo.
Tiedown rings
in C-130 Technical
Posted
May be, will attach the pics also