Jump to content

Priming/ CROSS FEED OPERATION


New Guy
 Share

Recommended Posts

  • 1 month later...
  • 2 weeks later...
  • 3 weeks later...

Some non operator somewhere calculated the flow rate and figured it was long enough based on the size of the pipes... But FWIW based on the pump rated output and the size of the pipe as well as the distance needed to travel one could (or has) figure out how much time is needed. 

Link to comment
Share on other sites

  • 3 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...