Jump to content

ENGINE Torque Cross limitation


munirabbasi
 Share

Recommended Posts

Hello  World Power plant expertise of T-56 A-15

Engine parameter cross the limitation TIT 1100  Celsius, Torque 20000 inch pounds fuel flow meter also cross limitation and could not  control by throttle movement.  Enine was shutdown as per procedure lay down -1

 can some body explain what is the reason behind it and can we run  the engine to repeat the defect without rectification. 

Best Regards

Munir Abbasi

Link to comment
Share on other sites

8 hours ago, pjvr99 said:

You will need to do a complete overtorque inspection of the QEC kit and truss mounts, and

also complete overtemp inspection and borescope the turbine, IGV and combustion liners

before attempting to start that engine again

Thanks Peter I need your E mail Address.

Best Regards

Munir Abbasi Home of Hercules Pakistan

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...